ONCE A TRAM DEPOT
Waldo Works, Willesden | Northwest London
A former depot for horse-drawn trams in Northwest London converted into a four bedroom live-work studio
-
Built in 1865 as a depot for horse-drawn trams, Waldo Works forms part of a group of five brick-built industrial buildings on Waldo Road in Kensal Rise. Designed with wide bays and generous ceiling heights to accommodate tramcars and horses, the buildings were part of the area's 19th-century tramway infrastructure. Our client purchased the building with the ambition of transforming it into a live-work space, taking advantage of its generous, open-plan volume.
Our approach began by stripping the building back to its essential structure, leaving little more than a brick shell, steel trusses and clerestory windows – a classic warehouse as blank canvas. Central to our client's brief was not only to provide maximum flexibility of use but also to retain a sense of scale and drama. We achieved this in part by lowering the floor level and introducing an oversized picture window overlooking London to the south and the railway lines below. To further exaggerate the building's height and width, we pulled the mezzanine floor forward, bringing together the bedrooms and the building's principal functions. This creates a sense of compression on entering. Moving forward, either straight through the space or up the stairs to the balcony, the interior opens up dramatically.
It was important to preserve and augment the building's industrial character. Alongside expressing the structural steelwork, we stripped back layers of paint to reveal the original brickwork. We enlarged the windows to the front and replaced the clerestory glazing, bringing in more light and reinforcing the sense of scale. Alongside these interventions, we introduced a collection of new and reclaimed materials. These included a large set of doors salvaged from a brewery and a new concrete floor with underfloor heating. The stair treads are made from reclaimed oak from an old maritime pier. We particularly liked the idea that the timber had spent more than half a century largely submerged in water. The dark stains left by the nails remain visible in the grain, recording something of its previous life. We continued this sense of material continuity with wall panelling made from floorboards salvaged from another of our projects. All the doors are reclaimed pine.
Taken together, these elements give the building a simple richness and generosity, with the appearance of something that has evolved over time rather than been made anew.
WORK IN PROGRESS
Originally designed as a tram depot, the building’s most recent history has been as offices and storage.The building was not only in poor condition but was also filled with asbestos. We stripped the building back to the bone and started again from the shell. Below are some images before we started as well as work in progress showing the new steel frame mezzanine, new stairs and new clerestory windows.